< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=942664790635113&ev=PageView&noscript=1" />

 XCMG diaphragm wall grab
XG500E Digging in Tibet for the First Time

 

Another new milestone: XCMG Diaphragm Wall Grab debuted in the area 3km above the sea level. The XG500E diaphragm wall grab was delivered to Tibet, assisting the water engineering projects in Tibet.

The project supported by XG500E during its trip to Tibet is the construction of cut-off wall in Lhasa City. Since the engineering geological conditions in Tibet are special and affected by hydrology and meteorology, the construction of cut-off wall is also complicated.

XG500E
XG500E in the Construction Site

Thick overlays in Tibet put strong requirements on high-strength turntable platform and TDP chassis with independent technology. The professionals communicated with the customers, studied the engineering drawings and customized the construction plan.

XG500E can be hoisted and lowered at a high or low speed is provided with 1400kN thrust oil cylinder, which enhances the ability to crush harder strata such as mudstone and iron plate sand, and the construction efficiency under special geological conditions since the trough was successfully formed on the day of delivery. In the later period, this product also provides more friendly and timely services to fully guarantee the construction schedule of the project.

piling machine

XG500E Worked in Tibet

As a strategic partner of XCMG, FES is not a provider of single equipment, rather a whole-solution provider.

Serving every customer wholeheartedly, FES provides powerful equipment for every project, supporting their success all the way forward.

 

Find more equipment such as Rotary Drilling Rigs, Solar Pile Driver, Casing Rotator, etc. 


Post time:Jan-13-2022

Leave Your Message